第2回
BWR の保全活動におけるコストおよびリスクの同時評価手法の構築
著者:
白石 夏樹,Natsuki SHIRAISHI,高橋 信,Makoto TAKAHASHI,橋爪 秀利,Hidetoshi HASHIZUME
発刊日:
公開日:
キーワードタグ:
The purpose of this study is to develop an evaluation method to optimize both cost and risk in maintenance strategy of BWR plant in long-term operation. Plant operation is simulated in a simplified model, and the condition of the components treated in the model are evaluated statistically with Monte Carlo simulation. While Probabilistic Safety Assessment(PSA) methods such as Fault Tree Analy sis(FTA), Event Tree Analysis(ETA), and Failure Mode and Effects Analysis(FMEA) are also used to estimate Core Damag...
英字タイトル:
Development of an Evaluation Method for Cost and Risk in Maintenance Strategy of BWR
第3回
原子力における社会構成的リスク低減のための情報提示に関する研究
著者:
北村 正晴,Masaharu KITAMURA,高橋 信,Makoto TAKAHASHI,橋爪 秀利,Hidetoshi HASHIZUME,白石 夏樹,Natsuki SHIRAISHI,八木 絵香,Ekou YAGI
発刊日:
公開日:
キーワードタグ:
Abstract: Outlines of, and the empirical observations from, an action research project aiming at improvement of relationship between nuclear community and the public have been reported in this paper. Ultimate goal of the project is effective reduction of social construct risk of nuclear power plants. As an initial approach to the goal, a proactive information provision scheme has been designed based on the knowledge acquired during our previous attemp t of public communication named repetitive dialogue for...
英字タイトル:
Proactive Information Provision for Reducing Social Construct Risk of Nuclear Facility
第3回
原子力プラントにおける保全計画の最適化手法の構築
著者:
伊藤 悟,Satoshi ITO,白石 夏樹,Natsuki SHIRAISHI,結城 和久,Kazuhisa YUKI,橋爪 秀利,Hidetoshi HASHIZUME
発刊日:
公開日:
キーワードタグ:
In this study, a new simulation method is developed for optimization of maintenance strategy in NPP as a multiple-objective optimization problem (MOP). The result of operation is evaluated as the average of the following three measures in 3 000trials: Cost of Electricity (COE) as economic risk, Frequency of unplanned shutdown as plant reliability, and Unavailability of Regular Service System (RSS) and Engineering Safety Features (ESF) as safety measures. The following maintena nce parameters are considered...
英字タイトル:
Development of an evaluation method for optimization of maintenance strategy in commercial plant
第1回
原子力発電所の保全活動における経済性および安全性の定量的評価手法の構築
著者:
白石 夏樹,Natsuki SHIRAISHI,橋爪 秀利,Hidetoshi HASHIZUME,結城 和久,Kazuhisa YUKI,高橋 信,Makoto TAKAHASHI
発刊日:
公開日:
キーワードタグ:
Abstract The purpose of this study is to develop a method for quantitative evaluation of the running cost and safety in a Nuclear Power Plant (NPP). A new model for numerical evaluation is proposed based on the concept where the four issues such as Cost of Electricity (COE), maintenan ce cost, loss by the failures, and several risks are evaluated statistically by using the Monte Carlo simulation. The results show different d ependence on the parameters used in the model. These results would be useful to d...
英字タイトル:
Development of quantitative evaluation method for the cost and safetyin maintenance plan of Nuclear Power Plant
論文
確率論的安全評価を用いた原子力プラントの長期運転における保全計画評価手法の構築
著者:
白石 夏樹,Natsuki SHIRAISHI,高橋 信,Makoto TAKAHASHI,橋爪 秀利,Hidetoshi HASHIZUME,若林 利男,Toshio WAKABAYASHI,宮田 浩一,Kohichi MIYATA,佐藤 親宏,Chikahiro SATO
発刊日:
公開日:
キーワードタグ:
The evaluation method for maintenance optimization in long-term operation of nuclear power plant (NPP) has been proposed by using Probabilistic Safety Assessment (PSA) in general. Possible troubles in the maintenance activities of NPP are modeled and simulated by using Fault Tree with failure rates of components estimated by operating experiences in Japan. The Monte-Carlo simulation has been performed to compare the maintenance strategies such as cycle extension of periodic inspection and overhaul for...
英字タイトル:
Development of an Evaluation Method for Maintenance Optimization in Long-term Operation of Nuclear Power Plant with Probabilistic Safety Assessment